Skip to main content

Detail – Energy Country Profile

Pöyry was assigned the feasibility and final design studies for Hydropower projects in Turkey

Pöyry is now in charge of the feasibility study and final design studies for the hydropower plants Doganli 1, Doganli 2, Doganli 3, for the Çukurca dams and the hydroelectric power plants.

The combined installed capacity of all 4 projects is around 735 MW with an annual generation of 2.246 GWh.

Source: Pöyry press release 29 July 2014